NEWS
No-load trial run completed successfully.
On May 1, 2026, the in-plant no-load test of model CB10.1-8.83/4.2/1.6/535 steam-electric dual-drive steam turbine for one of our coal chemical projects was completed successfully.Throughout the whole test process, from zero speed to overspeed test, the unit operated steadily. Key parameters including shaft vibration, bearing temperature and axial displacement all met the design requirements with excellent performance.

Search from here
Leave a message